CLIENT
|
PROJECT
|
DATE
OF COMPLETION
|
Consultant/
Remarks
|
|
Reliance Energy Limited, Mumbai.
|
Design,
engineering, manufacture, supply, erection, commissioning of Integral
coal handling system for 2 X 300 MW DCR Thermal Power Project at
Yamunanagar, Haryana with wagon tippler, stacker cum reclaimer,
crusher, conveyors, sampling system, online analyzer etc. structural,
electrical instrumentation work.
|
Dec
2007
|
Desein
Limited, New Delhi
|
|
Bhushan Steel & Strips Ltd., New Delhi.
|
Design, engineering, manufacture,
supply, erection and commissioning of Raw Material handling system
including mechanical and structural work for the Integrated Steel plant
at Meramandali, Orissa.
1) Design, engg, manufacture, supply
supervision of E & C of two Nos of roll crushers for handling char
in DRI plant
2) Raw Material Handling System having
belt conveyors, vibro-feeders, apron feeders, belt feeders, Belt
scales, trippers, gates, chutes etc
|
December 2005
April 2005
|
MECON, Ranchi
|
|
-do-
|
Design, engineering, manufacture,
supply, erection and commissioning of Material handling system for DRI
package consisting of belt conveyors, vibro-feeders, apron feeders,
belt feeders, Belt scales, trippers, gates etc.
|
March 2006
|
MECON, Ranchi
|
|
-do-
|
Design,
engineering, manufacture, supply, erection and commissioning of
Material handling system for SMS charging system.
|
July 2007.
|
MECON, Ranchi
|
|
Grasim Industries Ltd., Mumbai
|
Design,
engineering, manufacture, supply of belt conveyor system consisting of
80 nos of belt conveyors of total length approx. 12km for Cement plant
at Aditya Cement, Unit-II at Shambhupura, Rajasthan
|
July 2008
|
Holtec, Noida
|
|
UltraTech Cement Ltd, Mumbai
|
Design,
engineering, manufacture, supply of belt conveyor system consisting of
88 nos of belt conveyors of total length approx. 9.7km for Cement plant
at Andhra Pradesh Cement Works, Unit-II at Tadipatri, AP
|
July 2008
|
Holtec, Noida
|
|
Grasim Industries Ltd., Mumbai
|
Design,
engineering, manufacture, supply of belt conveyor system consisting of
20 nos of belt conveyors of total length approx. 0.8km for cement plant
at Birla Plus Cement, Panipet, Haryana
|
June 2008
|
Holtec, Noida
|
|
Rourkela Steel Plant (M/s. Steel Authority of India)
|
Design,
engineering, manufacture and supply of stock house conveying and
screening system incl. Civil, mechanical, structural and electrical
work.
|
June 2005.
|
CET, Ranchi
|
|
IISCO plant (Steel Authority of
India Ltd.)
|
Design, engineering,
manufacture, supply, erection and commissioning of Stockhouse system
for Blast Funace-2 for IISCO, Burnpur.
|
Dec
2008.
|
CET,
Ranchi
|
|
JSW Steels Ltd., (Jindal Vijayanagar Steel Ltd.,) Bellary
|
Design,
engineering, manufacture, supply, site fabrication, erection,
commissioning of conveyors including structural work, for Sinter Raw
Material handling System for expansion project.
|
August 2006.
|
|
|
JSW Steels Ltd., (Jindal Vijayanagar Steel Ltd.,)
Bellary
|
Design, engineering, manufacture,
supply, site fabrication, erection, commissioning of conveyors
including structural work, for Sinter Raw Material handling System for
expansion project.
|
May 2007
|
MECON, Ranchi
|
|
JSW Steels Ltd., (Jindal Vijayanagar Steel Ltd.,) Bellary
|
Design,
engineering, manufacture, supply, supervision of erection,
commissioning of belt conveyors and high angle conveyors for the EOF
HMPT handling System.
|
June 2007
|
MECON, Ranchi
|
|
Bhilai Steel Plant (M/s. Steel Authority of India,)
|
Design, engineering, manufacture, supply, erection, commissioning
of conveyors, screens including civil, structural, electrical work,
modification of equipment for Stock House Eqpt under revamping &
upgradation of BF-7
|
February 2007
|
CET, Ranchi
|
|
Videocon Narmada Glass, Bharuch
|
Design,
engineering, manufacture and supply of conveying system incl.
mechanical, structural and electrical work.
|
March 2006
|
MN Dastur & Co (P) Ltd, Mumbai.
|
|
Upper Ganges Sugar & Inds. Ltd., UP
|
Design,
engineering, manufacture and supply of bagasse and ash handling system
for the 22 MW Cogeneration power plant.
|
Phase
-1 & 2 commissioned.
|
|
|
Jaykaycem Ltd. (Subsidiary of JK.
Cement Ltd.,)
|
Design,
Manufacture and Supply of 25 Nos. of Belt Conveyors to their New 6500
TPD Cement Factory in Muddapur (Karnataka)
|
Supply
completed
|
|
|
Ispat Industries Ltd., Dolvi
|
Design, engg,
manufacture and supply, erection & commissioning of conveying
system for coke fines/ iron ore fines/ sinter.
|
March 2006
|
MN Dastur & Co (P) Ltd, Kolkata
|
|
Ispat Industries Limited, Dolvi
|
Design,
manufacture, supply of Blast furnace Return Fines conveyor systems at
the Sinter plant.
|
June 2007
|
MN Dastur
&CO., Kolkata
|
|
Grasim Industries Ltd., for M/s. RAJASHREE CEMENT
MALKHED KARNATAKA
|
Design, engineering,
manufacture and supply of conveying system incl. mechanical, structural
and electrical work. incl.
1) Modification of existing
CHP incl. supply of crusher of 210 TPH, flip flow screens - 2nos of
130TPH, belt conveyors along with DE system etc.,
2) Extension of
stockpile conveyors- 4 nos for stackers/ Reclaimers and CRDs for the same.
|
May
2008.
|
TCE Consulting
Engineers Ltd., Bangalore.
|
|
Vasavadatta Cement, Hyderabad
|
Design, engineering, manufacture,
supply, supervision of erection and commissioning of
a) Conveyor
system for in-plant material handling system for cement plant expansion
project-III at Sedam unit and coal stockyard conveyors
b) Belt conveyors of 1400 TPH capacity
for handling limestone from limestone from mines to new stacker
|
September 2006
-do-
|
|
|
Hindalco Industries Ltd., Kolkata
|
Design,
engineering, supply, fabrication, erection and commissioning of conveyors, feeders, DE, structure,
electrical and instrumentation for the 2 X300 TPH coal handling system
for the 100 MW CPP Unit-4 at Hirakud.
|
May
2008.
|
Development
Consultants (P) Ltd, Kolkata
|
|
Dalmia Cement (Bharat) Ltd., Dalmiapuram, TN
|
Design, engineering, manufacture,
supply& supervision of erection & Commissioning of belt
conveying system for material handling system for New Cement Plant
|
March 2006
|
Consultants: M/s.
Holtec Consulting Pvt Ltd, New Delhi.
|
|
Dalmia Cement (Bharat) Ltd., Dalmiapuram, TN
|
Design,
manufacture, supply of Coal Screen System of 150 TPH capacity for
screening coal of (-) 10mm and (-) 6mm for Cement/ Power plant.
|
March 2008
|
|
|
Chamundeswari Sugars Ltd, Bangalore
|
Design,
engineering, manufacture and supply of bagasse coal and ash handling
system for the 22 MW Cogeneration power plant.
|
May
2008.
|
Avant
Garde Engg. & Consultants
(P) Ltd., Chennai.
|
|
Madras Cements Ltd., Jayanthipuram AP
|
Design,
engineering, manufacture, supply of 26 nos of belt conveyors of capacity upto 1400
TPH for crusher, raw mill, coal handling and modification of existing
system
|
April 2008.
|
|
|
Jindal Steel & Power Ltd. Raigarh
|
Design, engineering, manufacture and
supply of screening system for SMS-II plant incl. 24 conveyors and 6
screens.
Design, engineering, manufacture and
supply of components for round caster in Unit-II plant.
|
June 2005
July 2005
|
Singh Associates,
New Delhi
|
|
GMR Inds Limited, Hyderabad
|
Design,
engineering, manufacture and supply of bagasse coal and ash handling
system for the 22 MW Cogeneration power plant.
|
April
2008.
|
Avant
Garde Engg. & Consultants
(P) Ltd., Chennai.
|
|
Rajshree Sugars & Chemicals Ltd, Coimbatore
|
Design,
engineering, manufacture, supply, erection and commissioning of bagasse
and ash handling system for 22 MW Cogeneration plant at Mundiampakkam,
TN.
|
April 2005
|
Avant- Garde Engineers & Consultants (P)
Ltd, Chennai
|
|
Thermax Ltd, Pune
|
Design,
engineering, manufacture, supply, erection and commissioning of Fuel
handling system for M/s. Arasmeta Power Co. Pvt Ltd.,
Chattisgarh.
|
April 2006
|
|
|
Thermax Ltd, Pune
|
Design,
engineering, manufacture, supply, erection and commissioning of Fuel
& Limestone handling system
for 2 X 18.5 MW CPP of M/s. Madras Cements Ltd., TN.
|
March 2005
|
|
|
Thermax Ltd, Pune
|
Design,
engineering, manufacture, supply, erection & commissioning of Fuel
handling system for M/s. Madras Cements Ltd at Jayanthipuram AP.
|
July 2007
|
|
|
Thermax Ltd, Pune
|
Design,
engineering, manufacture, supply, erection and commissioning of Fuel
handling system for Dwarakesh Energy Ltd., Rajasthan (JK Lakshmi
Cement )
|
March 2005
|
|
|
Nandi Sahakari Sakkare
Karkhane Niyamit, Bijapur
Dist.
|
Design,
engineering, manufacture, supply, erection and commissioning of bagasse
and ash handling system for 18.1 MW Cogeneration plant.
|
September 2005.
|
JP Mukherjee
& Associates, Pune
|
|
ITC Ltd., PSPD. Hyderabad
|
Design,
engineering, manufacture, supply, erection and commissioning of Fuel
handling system for Coimbatore unit.
|
June 2005.
|
TCE Consulting
Engineers, Bangalore.
|
|
ITC Limited, PSPD, Hyderabad
|
Design, engineering,
manufacture, supply of six nos of belt conveyors for Lime mud and Burnt
lime handling system.
|
May
2008.
|
SPB-PC
|
|
Paul Wurth India (P) Ltd, New Delhi
|
Design,
engineering, manufacture, supply of conveyors for Granulated Slag
System for M/s. Tata Steel Ltd., Jamshedpur.
|
April 2008.
|
|
|
My Home industries Ltd, Hyderabad
|
Design, engineering, manufacture,
supply, erection and commissioning of 24 nos belt conveyors for Cement
plant
|
June 2006
|
|
|
Sakthi Sugars Ltd. Coimbatore
|
Design,
engineering, manufacture and supply of bagasse and ash handling system
for the 22MW Power Plant at Sivaganaga.
|
May
2008.
|
Avant
Garde Engg. & Cons (P)
Ltd., Chennai.
|
|
Viraj Steel & Energy Ltd., New Delhi
|
Design,
engineering, supply, fabrication, erection and commissioning of raw
material handling system consisting of 37 nos of belt conveyors,
tripper conveyors etc., for the 2 X 350 TPD sponge iron plant
|
July 2006
|
Predominant
Engineers & Contractors (P) Ltd., New Delhi.
|
|
Soma Enterprises Ltd. New Delhi
|
Design,
engineering,, manufacture, supply, of conveyor, electricals supervision
of fabrication, erection and commissioning of 1200 TPH aggregate
handling conveyor for Subansiri Lower hydroelectric project.
|
July 2006
|
|
|
Maa Mahamaya Industries Pvt Ltd., Vizag
|
Design,
engineering, manufacture, supply, site fabrication, erection and
commissioning of conveyor system for RMHS for 350 TPD sponge iron
plant.
|
March 2006.
|
Predominant
Engineers & Contractors (P) Ltd., New Delhi.
|
|
Italcementi S.p.A, Italy
|
Rails
and accessories for the stacker and reclaimer for the cement plant
expansion project.
|
June
2008.
|
|
|
BSES Limited, New Delhi,
|
Design, engg,
manuf., supply, erection and comm. of coal/ lignite handling system for
the 12.5 MW CPP at Ariyalur, TN for Grasim Cements
Ltd.
|
June 2003.
|
Avant-Garde
Engineers (P) Ltd/ Holtec
Consulting Pvt .Ltd
|
|
Vandana Global Limited., Raipur
|
Design,
engineering, manufacture, supply, fabrication, erection and
commissioning of coal handling system for 33MW CPP.
|
July 2007.
|
MN Dastur & Co (P) Ltd, Chennai.
|
|
Action Ispat & Power (P) Ltd., New Delhi
|
Design,
engineering, supply, of Material Handling System for 350 TPD sponge
iron plant at Jharsuguda.
|
March 2006.
|
|
|
Metso Minerals Pvt. Ltd, New Delhi
|
Design and engineering, supply, fabrication
of conveyor structures and conveyor components.
|
Different Schedules.
|
For road construction projects.
|
|
Southern Iron and Steel Co. Ltd., Salem
|
Design, Engg.
manuf., supply, supervision of erection and comm. of conveyor system
for coke oven and blast furnace project for the steel plant expansion
project.
|
November 2006.
|
MECON Ltd.,
Bangalore.
|
|
Monnet Ispat Limited, New Delhi.
|
Design, Engg.
manuf., supply of conveyor system for RMHS for the iron ore and coal
handling for the 4 X 350 TPD/2X 100 TPD Sponge iron plant.
|
October 2006
|
|
|
Bhilai Steel Plant (M/s. Steel Authority of India Ltd.)
|
Design, engg, manufacture, supply, Erection
and commissioning of conveying, crushing and screening plant of
Oversize Iron ore lumps at Dalli Mechanised Mines.
|
March 2006
|
CET, Ranchi
|
|
Grasim Industries Ltd., Cement Division
|
Design, engg, manufacture, supply &
supervision of erection & Commissioning of belt conveying system
for Limestone conveying from Mines to plant 1300 TPH, Additives
conveying to Raw mill 250 TPH & limestone conveying from stockpile
to Cement Mills 250 TPH. for M/s. RAJASHREE CEMENT,
KARNATAKA
|
July 2004
|
Bhagwati Designs Pvt Ltd, Hyderabad
|
|
Grasim Industries Ltd., Cement Division
|
Design, engg, manufacture, supply &
supervision of erection & Commissioning of belt conveyors for
Limestone conveying from Mines to plant @ 1400 TPH. for M/S. VIKRAM CEMENT, NEEMUCH, M.P.
|
May 2004
|
HOLTEC Consulting Pvt Ltd., New Delhi
|
|
-do-
|
Design, engg,
manuf, supply supervision of erection & Commissioning of
pre-screening belt conveyor for Thermal power plant at Aditya
Cement.
|
May 2005
|
|
|
Grasim Industries Ltd., Cement Division
|
Design, engg,
manufacture, supply& supervision of erection & commissioning of
belt conveying system for coal washery plant at Raipur.
|
Commissioned
|
|
|
Grasim Industries Ltd., Cement Division
|
Design, engg,
manuf, supply supervision of erection & Commissioning of belt
conveyor, feeder, tripper and retrofitting of Gypsum Storage &
Reclamation system at Birla Plus Cement, Bathinda.
|
Supply completed.
|
HOLTEC Consulting
Engg. New Delhi.
|
|
-do-
|
Design, engg,
manufacture, supply & supervision of erection & commissioning
of belt conveying system for Limestone conveying to power plant.
|
March 2005.
|
|
|
-do-
|
Design, engg,
manuf, supply of coal, slag and gypsum handling conveyors for Cement
plant at Raipur.
|
June 2006.
|
|
|
-do-
|
Design, engg, manuf, supply, supervision of
erection & Commissioning of 9 nos of conveyors upto capacity of
1200 TPH of clinker/ gypsum for One MTPA Dadri grinding unit at Dadri,
UP.
|
May
2008.
|
HOLTEC
Consulting Engg. New Delhi.
|
|
UltraTech Cement Ltd., Mumbai
|
Design, engg,
manuf, supply supervision of erection & Commissioning of 4 nos of
conveyors for handling biomass and shredded tyre for the Gujarat unit.
|
Supply completed.
|
|
|
UltraTech
Cement Ltd. Mumbai
|
Design,
engineering, manufacture, supply of belt conveyor system of 18 nos of
belt conveyors for Ginigera Grinding Unit at Koppal Karnataka.
|
Supply
completed.
|
|
|
UltraTech
Cement Ltd. Mumbai
|
Design, engineering, manufacture, supply of
belt conveyor system of 17 nos of belt conveyors for Hirmi Cement Works,
Chattisgarh.
|
Supply
completed.
|
|
|
EEL India Ltd, New Delhi
|
Design,
engineering, manufacture of 64 nos of belt conveyors for Grasim
Panipat, Shambhupura, Kotputli, Ginigera and UltraTech-Tadipatri units
for the packing plant along with spiral chutes, liners.
|
April
2008.
|
|
|
Chettinad Cement Corpn. Ltd, Chennai
|
Design, engineering, manufacture, supply.
Erection and commissioning of coal handling plant for 15MW CPP at
Karikkali.
|
Oct 2004
|
Avant-Garde Eng
& Cons (P) Ltd & Holtec Consulting Pvt Ltd.,
|
|
Chettinad Cement Corpn. Ltd, Chennai.
|
Design,
Manufacture and Supply of coal handling system for the CPP at Puliyur
Works.
|
April
2008.
|
Avant
Garde Engg. & Cons (P)
Ltd., Chennai.
|
|
Chettinad Cement Corpn. Ltd, Chennai.
|
Design,
Manufacture and Supply of 38 Nos. of Belt Conveyors to their New 2 MTPA
Cement Factory at Ariyalur.
|
Dec
2008
|
Holtec Consulting
Pvt Ltd.,
|
|
Chettinad Cement
Corpn. Ltd, Chennai.
|
Design,
Manufacture and Supply of coal handling system for the CPP Works for
their New 2 MTPA Cement Factory at Ariyalur.
|
August
2008
|
Avant
Garde Engg. & Cons (P)
Ltd., Chennai.
|
|
RAS Cement (Shree Cements Ltd) Rajasthan
|
Design, engineering, manufacture, supply & supervision of
erection of Conveying system for 3000 TPD Cement plant at RAS,
Rajasthan
Design, engineering, manufacture, supply & supervision of
erection of Conveying system for 3000 TPD Cement plant at RAS,
Rajasthan
|
June 2005
July 2005
|
|
|
Jaiprakash Associates
Ltd. New Delhi
|
Design,
engineering, manufacture , supply of Coal handling Plant Package-1 for
Rewa CPP-3
|
Sept
2008
|
|
|
Coal Handling Plant Package (35 MW) for their
Unit at Sidhi.
|
Sept
2008
|
|
|
Coal Handling Plant Package (27 MW) for their
Unit at Dalla.
|
Sept
2008
|
|
|
Coal Handling Plant Package (27 MW) for their
Unit at Chunar
|
Dec.
2008
|
|
|
Mangalam Cement Ltd. Kota
|
Design, engineering, supply of coal and
Petcoke handling system including Crushers, vibrating and flip flow
screens for 17.5MW CPP at Kota.
|
August 2007
|
|
|
Seshasayee Paper & Boards Ltd., Erode.
|
Design, engineering, manufacture, supply& supervision of
erection of coal/ lignite
handling system for 20 MW CPP
|
Nov 2004.
|
SPB-PC Ltd., Chennai
|
|
Utkal Manufacturing & Services Ltd., Orissa.
|
Design, engg, manufacture, supply, erection
& Commissioning of Material handling system including screens &
feeders for Ferro Chrome plant at Choudwar.
|
March 2006
|
|
|
NTPC Limited, Talchar TPS
|
Design, manufacture, supply of four nos
of trippers with chutes, walkways, platform etc, flap gate with
actuator, pulleys, idlers brake Drive etc.
|
July 2007.
|
|
|
Jaiprakash Associates Ltd. N. Delhi
|
Design, engineering, manufacture,
supply, supervision of erection and commissioning of coal handling
plant for 38.5 MW CPP-III at Rewa (MP).
|
April 2006.
|
|
|
-do-
|
Two nos of belt conveyors with DE
system.
|
June 2006.
|
|
|
Om Shakthi Renergies Limited, Hyderabad
|
Fuel and Ash Handling system for 6 MW
Biomass based Power project at Chittor, AP
|
Nov 2003.
|
MN Dastur & Co., Chennai.
|
|
India Gypsum Ltd., Bangalore
|
Design, engineering,
manufacture, supply, erection and commissioning of the Raw material
conveying system for the Plaster board unit
|
|
|
|
Sangam Spinners Ltd, Bhilwara, Rajasthan
|
Design, Engg., manuf., supply, erection
and comm. of coal/ lignite/ Petcoke/ limestone handling system for 7.5 MW CPP
|
Oct 2003.
|
MN Dastur & Co., Chennai.
|
|
Sangam Spinners Ltd, Bhilwara, Rajasthan
|
Design, Engg., manuf., supply, erection
and comm. of Ash handling system for 7.5 MW CPP
|
Nov 2003.
|
|
|
Nova Petrochemicals Limited, Ahmedabad
|
Design, Engg. manuf., supply, erection
and comm. of coal, pet coke, limestone and groundnut shell handling
system for 7.5 MW CPP.
|
August 2003.
|
MN Dastur & Co., Chennai.
|
|
M/s. Stallion Engg. Systems Ltd., New
Delhi.
|
Design, engineering, manufacture, supply& supervision
of erection of 13 Nos of belt conveyors for coal handling upto 400 TPH.
|
March 2005.
|
|
|
Design, engineering, manufacture, supply&
supervision of erection of belt conveyors for coal handling upto 400
TPH for Dipka project.
|
April 2005.
|
|
|
Stallion Engg Systems Ltd., New
Delhi.
|
Design, engineering, manufacture, supply&
supervision of erection of belt conveyors for coal handling upto 300
TPH for Dipka project.
|
March 2005.
|
|
|
SMC Power Generation Ltd. New Delhi.
|
Design, engineering, manufacture, supply& supervision of
erection of Raw material handling system for Integrated Steel plant at
Hirma, Jharsuguda, Orissa.
|
Jan 2005.
|
Predominant Engineers, New Delhi
|
|
B. Seenaiah & Co (Projects) Ltd, Hyderabad.
|
Design, Engg. manuf., supply, erection
and comm. of biomass (rice husk, bagasse, Julie flora) and coal
handling system for 7.5 MW Power plant.
|
Oct 2003.
|
MN Dastur & Co., Chennai.
|
|
Stallion Engg Systems (P) Ltd. New Delhi.
|
Design, engineering, manufacture and supply of conveyor system
for handling coal of capacity upto 500 TPH
Design, engg, supply of conveyor system for coal washery.
|
March 2004.
|
Civicon Engineers
|
|
Sterlite Inds. Ltd.,
Tuticorin.
|
Design,
engg, manufacture and supply, fabrication and erection and
commissioning of Flux conveyor system.
|
September 2005.
|
|
|
Khanna Paper Mills Ltd., Amritsar.
|
Design, engg, manufacture, supply, erection & commissioning
of coal handling plant for cogen and power plant.
|
Dec
2004.
|
|
|
Jayaswals Neco Ltd, Raipur.
|
Design, engg, manuf., supply, erection
and comm. of Coal handling plant for 18MW CPP for
the steel plant at Raipur (Chattisgarh)
|
June 2003.
|
MN Dastur & Co., Kolkata
|
|
Additional requirement of system for above CHP.
|
-do-
|
|
|
Tamil Nadu Newsprint & Papers Ltd, Karur.
|
Bagasse handling system and Pith handling at Thuhili site.
|
Dec. 2003.
|
Avant-Garde Engineers
& Consultants (P) Ltd,
|
|
OCL India Limited., New Delhi
|
Design, engineering,
manufacture, supply, erection and commissioning of Belt conveyors for
handling clinker, coal, gypsum and slag for New Grinding unit at OCL,
Kapilas Road, Orissa.
|
May
2008.
|
Holtec
Consulting (P) Ltd, New Delhi
|
|
OCL
(India) Ltd, Rajgangpur Orissa
|
Design, engineering, manufacture, supply & supervision of
erection of 20 Nos of belt conveyors for CVRM-3 project.
|
September
2005
|
|
|
Design, engg, supply of belt conveyors for cement plant.
|
Completed.
|
|
|
Design, engg, supply of belt conveyors for bagging plant.
|
Completed.
|
|
|
Global Coal & Mining (P) Ltd. Talchar, Orissa.
|
Design, engg, supply of conveyors for coal
washery at Talchar Mines.
|
Completed
|
|
|
Design, engg, supply of conveyors for coal
washery at Talchar Mines.
|
Completed
|
Repeat order
|
|
Global Coal & Mining (P) Ltd. Talchar, Orissa.
|
Design, engg, supply of conveyors for coal
washery.
|
Completed.
|
Second repeat order
|
|
Supply of five nos of belt conveyors for
the coal washery at Jharsuguda, Orissa.
|
Completed.
|
Fourth order in 3
years.
|
|
Supply of one belt conveyor for Talchar
plant.
|
Completed.
|
Fifth order.
|
|
Aarthi Steels Ltd., Cuttack.
|
Design, engineering, manufacture, supply
& erection of material handling system for DRI storage &
Furnace Handling system.
|
June 2006.
|
|
|
Meghalaya Cements Ltd., Kolkata.
|
Design, engineering, manufacture,
supply& supervision of erection of 15 Nos of belt conveyors for
Lumshnong project.
|
Nov 2005
|
Holtec Consulting
Pvt Ltd, New Delhi & Hallmark, Pune.
|
|
Century Pulp & Paper, UA.
|
Design, engineering, manufacture, supply,
erection and commissioning of 4 Nos of belt conveyors for wood chip
handling.
|
Dec 2005
|
|
|
Chitrakoot Steel & Power Ltd, Chennai
|
Supply of
conveyor components and equipment viz., crushers, screens feeders for
100 TPD sponge iron plant.
|
Dec 2005
|
|
|
Loesche India Pvt Ltd., New Delhi.
|
Design, engineering, manufacture, supply of
belt conveyors for Nigeria Project.
|
February 2006
|
|