EPC Power Division

The EPC Power Division of Tecpro Systems Ltd takes care of EPC contracting of Power plants of various types as follows:

Coal based power plants (single/ multi fuels like indigenous Coal of all grades, Dolochar, Coal fines/washery rejects - with Naphtha, CNG/ LNG and biomass as support fuels and imported coal from Indonesia/ South Africa/ Australia)

Waste heat recovery based power plants utilizing blast furnace / coke oven gas & cement kiln gas

Small/ Mini hydro electric power projects – turbines of Pelton, Francis & Kaplan types

Municipal solid waste with most renowned technologies like mass burning & RDF technologies 

Tecpro provides State-of-the-art Design & engineering/ Project management/ Procurement/ Construction management.

 Tecpro’s scope of work/ services include concept to commissioning on complete EPC basis or BOP – EPC basis of power projects.

In technical collaboration with Nanjing Triumph Kaineng Environment & Energy Co. Ltd (NTK) and leveraging our capabilities and experience in the arena of EPC projects, we provide turnkey solutions for Waste Heat Recovery Boiler based Thermal Power plants. M/s. NTK is a leader in this sector with more than 100 installations totaling 750 MW generation especially for cement plants.

S. No

Target Name

Scale of Cement Production Line


Clinker Output Of Cement Kiln (t/d)








Installed Capacity Of Waste Heat Power Station

3 MW

3.5 MW

4.5 MW

6 MW

7 MW

9 M


Annual Operation Hours For Power Station

7200 h


Annual Generated Energy (kwh)

1800 x 104

2160 x 104

2804 x 104

3750 x 104

4592 x 104

5810 x 104


Annual Power Supply Volume (kwh)

1674 x 104

2009 x 104

2608 x 104

3487 x 104

4270 x 104

5403 x 104


Self Power Consumption Rate Of The Power Station

7 %