EPC Power Division

The EPC Power Division of Tecpro Systems Ltd takes care of EPC contracting of Power plants of various types as follows:

Coal based power plants (single/ multi fuels like indigenous Coal of all grades, Dolochar, Coal fines/washery rejects - with Naphtha, CNG/ LNG and biomass as support fuels and imported coal from Indonesia/ South Africa/ Australia)

Waste heat recovery based power plants utilizing blast furnace / coke oven gas & cement kiln gas

Small/ Mini hydro electric power projects turbines of Pelton, Francis & Kaplan types

Municipal solid waste with most renowned technologies like mass burning & RDF technologies 

Tecpro provides State-of-the-art Design & engineering/ Project management/ Procurement/ Construction management.

 Tecpros scope of work/ services include concept to commissioning on complete EPC basis or BOP EPC basis of power projects.

In technical collaboration with Nanjing Triumph Kaineng Environment & Energy Co. Ltd (NTK) and leveraging our capabilities and experience in the arena of EPC projects, we provide turnkey solutions for Waste Heat Recovery Boiler based Thermal Power plants. M/s. NTK is a leader in this sector with more than 100 installations totaling 750 MW generation especially for cement plants.

S. No

Target Name

Scale of Cement Production Line

1

Clinker Output Of Cement Kiln (t/d)

1500

2000

2500

3200

4000

5000

2

Installed Capacity Of Waste Heat Power Station

3 MW

3.5 MW

4.5 MW

6 MW

7 MW

9 M

3

Annual Operation Hours For Power Station

7200 h

4

Annual Generated Energy (kwh)

1800 x 104

2160 x 104

2804 x 104

3750 x 104

4592 x 104

5810 x 104

5

Annual Power Supply Volume (kwh)

1674 x 104

2009 x 104

2608 x 104

3487 x 104

4270 x 104

5403 x 104

6

Self Power Consumption Rate Of The Power Station

7 %

 

Copy Rights 2021 - Tecpro Systems Ltd. All rights reserved